Country code |
GB |
Repository code |
234 |
Repository |
National Records of Scotland |
Reference |
RHP81087 |
Title |
Plans of Milngavie, Strathendrick and Port of Monteith Railway |
Dates |
Nov 1889 |
Access status |
Open |
Access conditions |
This record has been digitally imaged and will not be produced for readers. The digital images may be seen in the NRS Search Rooms on the 'Virtual Volumes' system |
Location |
On site (Sighthill) |
Description |
Engineers: Formans & McCall. Lithographers: Maclure, Macdonald & Co, Glasgow. 1. Bound plans and sections of Milngavie, Strathendrick and Port of Monteith Railway line from Glasgow Central Railway at Maryhill to Strathendrick and Aberfoyle Railway at New Killearn Station and other works: November 1889. With, at front, two 1 inch Ordnance Survey maps (sheets 30 and 38) showing proposed route of railway. Multiple scales. 8 pages. 555 x 760 mm 2. 'Book of reference to the plans of the intended Milngavie, Strathendrick and Port of Monteith Railway, and to the plans of the intended doubling of parts of the Strathendrick and Aberfoyle Railway, and the Forth and Clyde Junction Railway'. 82 pages. 330 x 210 mm. 3. Duplicate of no.1 without Ordnance Survey sheets 4. Duplicate of no.2 |
Level |
File |
Extent |
4 volumes, rolled |
Related material |
SC67 |
Archival history |
Stirling Sheriff Court (SC67) |
|
|
|