Country code |
GB |
Repository code |
234 |
Repository |
National Records of Scotland |
Reference |
RHP46448 |
Title |
Bound plans and sections of Highland Railway various lines, including Inverness to Spean Bridge, Mucomir to Fort William and other works, with book of reference (Gazette notice bound in |
Dates |
November 1894 |
Access status |
Open |
Location |
On site (Sighthill) |
Description |
1. 'Highland Railway Plans and Sections of Line from Inverness to Spean Bridge and Fort William'. Engineers: Murdoch Paterson and Sir John Fowler. Lithographers: Robert J. Cook & Hammond, London. Various scales. 565 x 777 x 5 mm. 20 pages. Lithographed. Plans and sections of Highland Railway various lines, including Inverness to Spean Bridge, Mucomir to Fort William and other works. With Ordance Survey map annotated to show route of the railways. Railway 1 runs from Spean Bridge, along Loch Lochy and Loch Ness, to join Highland Railway at Inverness. Railways 2-5 run from Fort William to join Railway 1 at Loch Lochy.
2. Book of reference (Gazette notice bound in) 3-4.Duplicates of nos.1-2 |
Level |
File |
Extent |
4 volumes, rolled |
Related material |
SC29 |
Archival history |
Inverness Sheriff Court |
|
|
|
NA472 | Inverness-shire, Scotland |
|
|